Pipeline Systems for Pumping Concrete

Laydown System is made up of 10 foot pipes, short pipes, elbows, clamps and hoses as required to reach from the pump to the point of placement. The most common sizes used for laydown system are 5 inch and 4 inch systems, although we also stock smaller systems for special applications in 3.0 inch, 2.5 inch and 2.0 inc.

For additional information, please connect with us.

Want to see more?

Browse our complete inventory of products.

SALE! Don’t miss out on this limited time offer on PUTZMEISTER TELEBELT TB110 AND TB130 OEM new parts in stock 50% discount off list price.
+